Box 1

1/1 Finding aid

Board of Adjustment Series 

1/1a Building Permit Ledger, 1962-1971
1/2 Oak Manor Second Addition-Dedication and Restrictive Covenants, March 19, 1969
1/3 St. Luke's Hospital School of Nursing-Dormitory Residence, 1956
1/4 Residential and Business Dwellings-North Fargo
1/5 Residential and Business Dwellings-South Fargo
1/6 New and Completed Basement Dwellings-North and South Fargo
1/7 Board of Adjustment-Part I, 1953
1/8 Board of Adjustment-Part II, 1954-May 31, 1955
1/9 Board of Adjustment-Part III, June 1, 1955-1956

Applications and Agreements Series

1/10 Applications and Agreements-Part I, 1946-1948

Box 2

2/1 Applications and Agreements-Part II, 1946-1948
2/2 Applications and Agreements-Part III, 1946-1948

Temporary Housing Agreements Series

2/3 Temporary Housing Agreements, Name Index A-Z, 1947-1949
2/4 Temporary Housing Agreements, A, 1946-1949
2/5 Temporary Housing Agreements, B, 1946-1949
2/6 Temporary Housing Agreements, C, 1946-1948
2/7 Temporary Housing Agreements, D-E, 1946-1949
2/8 Temporary Housing Agreements, F-G, 1946-1949
2/9 Temporary Housing Agreements, H-I, 1946-1949
2/10 Temporary Housing Agreements, J-K, 1946-1949
2/11 Temporary Housing Agreements, L-M, 1946-1949
2/12 Temporary Housing Agreements, N-O, 1946-1949
2/13 Temporary Housing Agreements, P-Q-R, 1946-1949
2/14 Temporary Housing Agreements, S-T-U, 1946-1949
2/15 Temporary Housing Agreements, V-W-X, 1946-1949
2/16 Temporary Housing Agreements, Y-Z, 1946-1948
2/17 Temporary Housing Agreements, Misc. Correspondence, 1946-1948

Building Inspections Series

2/18 Hotel and Boarding House Inspections, A-C, March 1948
2/19 Hotel and Boarding House Inspections, D-F, March 1948 

Box 3

3/1 Hotel and Boarding House Inspections, E-M, March 1948
3/2 Hotel and Boarding House Inspections, N-S, March 1948
3/3 Hotel and Boarding House Inspections, T-Z, March 1948
3/4 Inspections, Misc. Correspondence, 1948

House and Sanitation Officers' Correspondence Series

3/5 Bradley, C.L., Senior Sanitarian-Correspondence, August 8, 1951
3/6 Nichols, A.A., M.D., Health Officer, Correspondence- Part I, August-October, 1950
3/7 Nichols, A.A., M.D., Health Officer, Correspondence-Part II, May-September, 1951
3/8 Nichols, A.A., M.D., Health Officer, Correspondence-Part III, August 1952 & January-February, 1953

Architectural Specifications Series

3/9 Legal Description and Specifications, 1927, 1949, & 1954
3/10 Specification Books, 1922 & 1931 

Architectural Drawings Series

Case 27
File 1

1. Milcor Lok-Rib Building; Erection Instructions and Foundation Suggestions; Building (24'X30') for J.A. Shaw Construction Co., 725 21st St. N., dealer,-Smith Inc. of Fargo; Inland Steel Products Company, Milwaukee, Wisconsin, (Shaw Construction, Tylers Addition), MP 84209, bldg #6, LR-5080, date 1-1-55, revision 6-1-55 (Information was on the cover of the large book with 16 pages.)
E-1: introduction (general notes)
E-2A: building layout (24' wide)
E-3B: LR-5080 6-1-55 foundation plan
E-3D: LR 5080 foundation plan
E-4, A: foundation walls, 1-1-55 and 6-1 55
E-5A: scaffolds
E-6: base channels
E-7: first two arches
E-8, A: first two arches
E-9A: first two arches
E-11, A: additional Arches
E-12: end wall
E-13B: end wall
E-13, C: end wall
E-14, A: slide door
E-15: slide door
E-16: windows, louvers, and ventilators

2. Unidentified Building (house) (2 sheets)
Sheet 1: outside view
Sheet 2: inside view, they call the bedrooms chambers

3. Unidentified Building (house) (1 sheet)
Sheet 1: front elevation and side elevation and floor plan and basement plan

4. Unidentified Building (2 sheets)
Sheet 1: south elevation and cross section, on back of drawing written "A. Myhre permit #6305"
Sheet 2: west elevation and first floor, A. Myhre, 8-19-41

5. Apartments for the Honorable T.P. Riley--Fargo; William F. Kurke, Arch., Fargo, May 1929 (1 sheet)
Sheet 1: apartment floor plan

6. Sowden-Garage crossed out and replaced with S.A. Laudon Garage; C.A.P. Turner Co. Cons. Engineers, Jewelers exchange building Minneapolis (3 sheets)
Sheet 1: scheme for placing spiral mushroom reinforcement, 5172, Aug. 18, 1916
Sheet 2: plans and details, Loudon Garage, Bowers Bros. Contr., Fargo, 5481
Sheet 3: 5481 plans and details

7. F.W. Woolworth (3 sheets)
Sheet 1: rear elevation and cross sections of new addition #128 Fargo, sheet #84-1922, Oct. 25, 1922
Sheet 2: store number 128 old location remodeled, basement plan
Sheet 3: store number 128 old location remodeled first floor plan

File 2

1. Grand Theater; Joseph E. Rosatti, architect, Fargo with Liebenberg E. Kaplan, consulting architects, Minneapolis; (13 sheets)
Sheet 1: basement floor plan 9-14-34
Sheet 2: first floor plan
Sheet 3: 2nd floor plan
Sheet 4: roof plan
Sheet 5: longitudinal section
Sheet 6: cross section towards foyer, cross section towards stage
Sheet 7: front and rear elevation
Sheet 8: side elevations
Sheet 9: detail stairs and store front
Sheet 10: plan of steel framing and ceiling, details of canopy
Sheet 11: details of side structure, side elevation, front elevation, details of sign
Sheet 12: details of ticket booth
Sheet 13: detail of cresting, detail of foyer radiator grill, structure details of exterior cases similar to interior cases

2. Fargo Foundry Co. Co., Ship to T.F. Powers and Co., Donovan Garage via truck shipment wanted, 2-27-29. This order is for ramp steel, order no 9374, 2-20-29 (8 sheets on one big piece of blueprint paper, sheet 2 measurements of steel (2 big sheets total)

3. Plan of the Remodeled Stores located N.P. Avenue under No. 623 for Bowers Bros., Fargo (1 sheet)
Sheet 1: front elevation and first and second floors)

File 3

1. S&L Tire (5 sheets)
Sheet 1: floor plan (mini), 2-17-87
Sheet 2: plot plan, 5-12-87 (39th St. SW)
Sheet 3: S&L Tire Service Center, Moritz, Gabel Construction, Fargo, 5-28-87, drawn by Lundstrum floor plan
Sheet 4: Moritz, Gabel, Kramer construction Co., Fargo, 5-15-87, Lundstrum, office front elevation, typical wall section
Sheet 5: S& L Tire and Gateway Builders, 2-17-87, upper office plan

2. Interior Lumber; Van Raden Construction. (3 sheets)
Sheet 1: foundation plan, 5-18-81
Sheet 2: 5-18-81, 1st floor plan
Sheet 3: 2nd and 3rd floor plans, 5-16-81

3. State Theatre, Fargo; Uebenberg and Kaplan, architects and engineers, Minneapolis (2 sheets)
Sheet 1: job #2781, 10-20-50 sections
Sheet 2: first floor plan, basement plan,10-20-50

File 4

1. Continental Block Remodeling; Roel Construction, July 1940 (3 sheets)
Sheet 1: Roel Construction, July 1940
Sheet 2: alterations to continental building
Sheet 3: suggested full size, construction details, front alterations

2. Hogan Flats (5 sheets)
Sheet 1: elevation on court
Sheet 2: Transverse section "AA"
Sheet 3: Basement plan Hogan by G.O. Anderson Jackson Flats 16 2nd Ave. North, Hogan flats 1916
Sheet 4: typical floor plan
Sheet 5: longitudinal section

3. NW Telephone Exchange Company of Fargo; Hewitt and Brown, Architects, engineers, 716 4th Ave. South, Minneapolis (3 sheets)
Sheet 1: block plan
Sheet 2: cross section
Sheet 3: basement plan

File 5

1. Nash Finch Co. of Fargo; Anton Jensen, architect (8 sheets)
Sheet 1: proposed banana rooms for Nash Finch, May 16, 1938
Sheet 2: May 24, 1938, construction details of banana rooms
Sheet 3: DWG #100 fruit dispatch company banana room temperature control assembly in cabinet, 3-15-38
Sheet 4: May 31, 1938, Nash Finch building at Fargo, pier footing, SW corner pier, typical wall footing expansion wall joints
Sheet 5: first floor plan and block and drainage plan
Sheet 6: jamb detail from counter-balanced doors, details for overhead metal clad truck doors, west elevation, south elevation, E and N elevation
Sheet 7: detail of roof framing and typical wall section
Sheet 8: stair details May 31, 1938, column schedule and columns and footings

2. Garage Building to be erected at 4th Ave. N and 5th St., Fargo, Messrs. Sam and Hugo Fields Lessor; Frosaker and Donovan, Lessee; William F. Kurke, Architect, Fargo (5 sheets)
Sheet 1: basement plan, Sept. 1927
Sheet 2: first floor plan
Sheet 3: Mezzanine floor
Sheet 4: roof plan
Sheet 5: E and W and north elevation

3. Butler Mfg Co., Minn., Minn. and Kansas City , Missouri for Northern Pacific Railway Co., 12-10-37 (4 sheets)
Sheet 1: no.: 7-B-231 our order no.: R-8048, plan of pier #1 and #2, foundation plan of 32X74X10' steel building
Sheet 2: standard 32 - 0" center truss, Aug. 5, 1937, Butler Mfg. Co., DRG7-Y 12
Sheet 3: for: Northern Pacific RY no. 7-B-231, our order no K-8048 12-14-37 Grection print for 32'X74'X10' steel building
Sheet 4: miscellaneous details for Northern Pacific Railway Co., 12-16-37, no 7-B-231, our customer order number K-80 48

File 6

1. The Texas Company (Texaco); specs the Texas company domestic sales department, specs for asphalt concrete driveways and black top service areas (15 sheets)
Sheet 1: the Texas Company 135 e 42nd St New York, 72" diam. trade mark sign, banjo type sign post installation details, April 14, 1936, No. l DS-L-2874-A
Sheet 2: the Texas company type EM 2 Bay R.H. Plans, steel king company Mil. WI NO EM- 2721RP, March 5, 1953, bolt setting detail, section S-S and B-B
Sheet 3: type "EM" 2 bay right hand porcelain elevations and details steel com., Feb. 25, 1953 NO. EM-2722RP
Sheet 4: "EM" specifications the Tex. Co steel com,., May 8, 1953, sheet 1 of 2, no. 5-101
Sheet 5: same as 4, sheet 2 of 2
Sheet 6: type EM, EMW, General details, No. G-801P, July 1, 1953
Sheet 7: type EM shelving and cabinet details, no. G-604 June 8, 1949
Sheet 8: service station chain link fence, no. DS-4037 Nov. 6, 1952
Sheet 9: tx comp Groveland Ave. and Clifton Place, Minn., yard details, 2-25-53, no. M-1100?
Sheet 10: tx comp Minn. service station gasoline tank installation and piping details M-522 12-6-51
Sheet 11: tx MN,-service station waste and fuel oil tank installation, M-570, 1-24-52
Sheet 12: Steel King Company, 521 E. Burleigh St., heating plan Texaco "EM", "EMW" and "CEM" R.H., 5-12-53, no. H-470-R
Sheet 13: Steel King. Co., 2328 W. State St.,-overhead door details, 7-12-51, G-510-P
Sheet 14: Tx Com. domestic sales dept. Minn. division, 1st Ave. North and 10th street Fargo, general arrangement plan 3-19-54 M-1176
Sheet 15: Steel King Com. (builders), electrical plan Texaco type "EM" station Jan 15, 1958, NO. GT-108

2. Co-operative Garage Company Building of Fargo; W.D. Gillespie , architect, Fargo (4 sheets)
Sheet 1: plain no. 108, April 1919 ground floor plan
Sheet 2: longitudinal section n s e w elevations
Sheet 3: details of stair, concrete construction for typical floor plan, of partition bet office and garage
Sheet 4: elevation and detail of 2 south bays and detail of trusses

3. Alex Stern's Store and Lodgings of Fargo (2 sheets)
Sheet 1: basement and first and second floor and cross section
Sheet 2: longitudinal section

4. Kinney, Inc. Alterations of Store Front; 55 Broadway (Kinney Shoes), 1940 (1 sheet)
Sheet 1: showing elevation and section through vestibule ATC, William Stern

File 7

1. Prairiewood Drive Apartments; Brekke Construction Inc. ( 6 sheets)
Sheet 1: 34th Street S. preliminary 21 unit
Sheet 2: main floor, type A,B,C units
Sheet 3: lower level- type D unit, upper level- D unit and main floor-type E unit
Sheet 4: foundation plan, July 1983
Sheet 5: unit C, D, E
Sheet 6: March 30, 1983, Prairiewood Court, a 24 unit PUD typical front elevations and unit plans

2. 20 Unit Apartment Complex; H&H Associates, Inc., 3481 South University Dr.,-Fargo (7 sheets)
Sheet 1: A-1, site plan, garage layout, gen. spec.
Sheet 2: A-2 FTG and foundation plan
Sheet 3: A-3 layout of apartments
Sheet 4: A-4 wind bracing
Sheet 5: A-5 North and south elevation and east and west elevation
Sheet 6: A-6 beam detail, and window detail
Sheet 7: A-7 wall intersection and patio and wall section

3. Drawings for Apartment Building (4 sheets)
Sheet 1: shows existing 8-plex and new? 8-plex with garages
Sheet 2: lower floor plan
Sheet 3: upper floor plan
Sheet 4: 5-31-84 front elevation

File 8

1. Moving Pictures Theatre for Mr. W.J. Hawk-Fargo; Geo. F. Dippell, architect, Fargo (8 sheets)
Sheet 1: basement and footing, March 12, 1921
Sheet 2: main floor plan
Sheet 3: mezzanine floor plan
Sheet 4: balcony plan
Sheet 5: longitudinal section of center line
Sheet 6: detail showing porthole openings in projection booth, framing plan-balcony, detail on balcony floor construction
Sheet 7: plan of lower chord showing method of splicing- typical for all roof trusses
Sheet 8: full size detail of radiator grill and detail of wood baluster to be used around orchestra pit--same detail adapted to required sizes to be used under floodlights and above emergency exits

2. Mr. J. A. Johnson's Shop; O. A. Braseth, architect, Fargo (3 sheets)
Sheet 1: floor plan and north and south elevation, tag on drawing says "lot 6 B10; Keeney and D garage G . S. Johnson
Sheet 2: east and west elevation and cross section and detail of door lintel
Sheet 3: detail of truss

File 9

1. BG Homes?, Stenerson Lumber Company (2 sheets)
Sheet 1: BG homes and Stenerson Lumber Company
Sheet 2: 3rd floor plan, unit over 1 bedroom laundry and 1st floor plan-unit under 1 bdr/laundry

2. Advance Structures, Inc.?,-Fargo? (2 sheets)
Sheet 1: Building Sprinkler Co., Fargo, 6-20 72, drawing number 186 elevations
Sheet 2: bolt layout scale floor plan scale

3. Wheel Service Company of Fargo (LLAD Fargo); Houston Engineering, Inc. (3 sheets)
Sheet 1: site plan project no. 1732-76, 9-24-76 (sheet one of one)
Sheet 2: Mezzanine Plan, floor plan; general contractor Olaf Anderson and Son, Fargo
Sheet 3: elevations

4. Clark Super 100, First Ave. No and Twelfth Street, Fargo (2 sheets)
Sheet 1: Clark Oil and Refining, 8530 West National Ave. Corporation, West Allis, Wisconsin, drawing and legal description
Sheet 2: duplicate of sheet 1
5. Clark's Service Station for Petco Corporation (same as no. 4 above?); Walter Pollatz, AIA, architect, Milwaukee, Wisconsin (15 sheets)
Sheet 1: Clark's service station for Petco Corporation, order 480, sheet 1, 3-29-54
Sheet 2: floor plan, foundation plan, reflected ceiling plan, roof plan 480 sheet 2
Sheet 3: section A A f,s, statuib D 1/3 thru windows 480 sheet 3
Sheet 4: interior details, sheet 4
Sheet 5: fs section A 1/5 through cornice, 3-1 54 order 479 480 sheet 6
Sheet 7: fs section c 1//7 through cornice, fs section A 2/7 at top of wall, 479 480, 3-1-54
Sheet 8: 3-1-54 misc. glass setting details, misc. door frame details, 479, 480 8
Sheet 9: fs section R 1/0 through sigh base, 3-29-54, 480 9
Sheet 10: details of billboard, fence and price sign, 3-29-54, 480 10
Sheet 11: fs sections of billboard and signs, A 10/11, B 10/11 C 10/11 E 10/11, 3-29-54, 480, 11
Sheet 12: details of banjo sign, post light, flood light post, air tower, pedestal islands, detail of tank, plumbing unit and access pit, 3-29-54, 480 12
Sheet 13: plan of roof framing side elevation, misc. details, 3-29-54, 480, s1
Sheet 14: details of steel beams and columns, 3-29-54, 480, S2
Sheet 15: electrical plan, GE control panel wiring diagram, distribution, center wiring diagram, right side wall of storage room, 480, E1 

File 10

1. Fargo City Warehouse Addition; Sept. 9, 1927 (2 sheets)
Sheet 2: outside garages and parking spaces

2. Federal Land Bank Office Building,-Fargo, Halvorson, Moore, Sprague and Moore, architect, engineers and planners, Fargo (7 sheets)
Sheet 1: title sheet and site plan, project no 7506, issue date July 1976 G
Sheet 2: floor plan G-2 July 1975
Sheet 3: elevations G-5
Sheet 4: wall section and details G-6
Sheet 5: foundation plan -plumbing, heating and air conditioning M-1
Sheet 6: floor plan- plumbing, heating and air-conditioning M-2
Sheet 7: floor plan--power, lighting and systems E1

3. Crane Johnson Laboratories, -JEM investment (5 sheets)
Sheet 1: Crane Johnson LBR 12-plex H. Miller stair section and typical wall section
Sheet 2: side elevation and front elevation
Sheet 3: Crane Johnson Lumber, 12-plex h. miller 2nd and 3rd floor plan
Sheet 4: lower floor plan, crane 12-plex h. miller
Sheet 5: crane 18-plex harry miller floor plan attic area floor joist layout 

File 11

1. Ed Welle Construction, 12 plex; (5 sheets)
Sheet 1: plot plan, 7-1-76
Sheet 2: Simonson Lumber, Fargo, Ed Welle Const. 12-plex- 6-25-75, Gene Whicterman?,-architectural draftsman, revised 2-9-76, 1st and 2nd floor
Sheet 3: 6-25-75, 12-plex-ed Welle Cons., Simonson Lumber, Fargo, basement level
Sheet 4: 6-25-75, revised 2-9-76, front and back outside view of 12-plex
Sheet 5: 6-25-75, revised 2-9-76, wall section and round plan

2. [Unnamed] (3 sheets)
Sheet 1: letter to Sam Geller from Cass County (MCM Enterprises, Box 2431, Fargo), verification of transaction, the letter was from C.A. Miller, Jr., Cass County Director of Tax Equalization
Sheet 2: Sam Geller--Froemke Builders--9-27-77--G-1, "Legal Descrip?," Existing building and new steel building, 12th avenue
Sheet 3: G-2, am Geller--Froemke Builders, 9-27-77, floor plan and south and east elevation

3. Standard Oil Company--Fargo division (16 sheets)
Sheet 1: misc piece of paper with 25,000.00 on it
Sheet 2: proposed layout--s.s COSSL N2 5035, Standard Oil Co., Fargo division, 1-13-54-, First Ave, North--w?, s highway N 10, 10th St. N.
Sheet 3: detail-mud sump--standard oil company service station bldgs., Fargo field, 2-19-53, detail meter pit--Standard Oil Company, service station buildings, Fargo field, 2-19-53, "order greatest from Fargo Foundry"
Sheet 4: Chicago vitreous enamel product company--(1407-1455), title 52-d-2L class 5, floor plan-March 27, 1952, CF-520-L A-52121
Sheet 5: foundation plan 52-D-2L class 5, service station, porcelain through out on metal framing standard oil company contr. engineering dept.-sales, Chicago 5-20-52 NO. A-52122
Sheet 6: Chicago vitreous enamel product company title 52-D-2L class 5, exterior conditions, March 27, 1952, CF- 521-L A-52123
Sheet 7: Chicago, title 52-D-2L class 5, reflected ceiling plan March 27, 1952, CF-522-L A-52124; sheet 7 Chicago, CF 525-L A-52127 title class the same as before for standard structural elevations, March 28, 1952
Sheet 8: Chicago, class title for standard interior elevations, March 28, 1952, Cf- 523-L A-52125
Sheet 9: Chicago... title and class... for standard... structural ceiling plan, March 28, 1952, CF-524-L, A-52126
Sheet 10: heat loss schedule, heating 52-D-2L, layout for 52-E-2L, class 5 service stations, Standard Oil Company Const. Eng., NO. A-52132
Sheet 11: service station 52-D-2L ,class 5, electrical plan, 5-14-52, A-52133
Sheet 12: schematic layouts of service entrance panel for type 52-D-2L class #5
Sheet 13: shelving details for 52-D-2 R/L, 6-15-52, NO. B-52110
Sheet 14: exact piping locations for plumbing fixtures for 52-D-2L class #5 service station , No. B-52128
Sheet 15: exact accessory locations for toilet rooms 52-D-21 class 5 service stations, 5-15-52, No. B-52129
Sheet 16: plumbing layout 52-D-2L class 5 service station, 5-21-52, NO. B-52130

File 12

1. Staiger 8-Plex on 30th Ave. S, Simonson Lumber and Hardware; Dave Steiger construction- foundation plan (stapled together backwards) (8 sheets)
Sheet 1: (their sheet number 4) wall section, 4-12-84
Sheet 2: duplicate of sheet 1
Sheet 3: (their sheet number 3), 2nd floor plan, 3-23-84
Sheet 4: duplicate of sheet 3
Sheet 5: (their sheet 2), main floor plan, 3-21-84
Sheet 6: duplicate of sheet 5
Sheet 7: (their sheet 1), front elevation, 3-23-84
Sheet 8: duplicate of sheet 9

2. Banker's Construction (8-plex), Fargo (4 sheets)
Sheet 1: 2nd floor plan, 7-10-84
Sheet 2: first floor plan, 7-10-84
Sheet 3: west side elevation, 7-10-84
Sheet 4: footing plan, 7-10-84

3. Regan-Wieland 10-plex, 25th Ave. S. (BG Homes, owner) (2 sheets)
Sheet 1: site layout, building elevators
Sheet 2: second and third floor plans; June 18, 1984

File 13

1. Crane Company Warehouse Addition; William F. Kurke, Architect (4 sheets)
Sheet 1: front and side elevation
Sheet 2: elevations, bathroom # 1 and 2, elevation of west wall, north wall- main display room, typical mouldings- full size
Sheet 3: details for alterations to office entrance
Sheet 4: base-f.s.d. typical details

2. Anda Construction Company, Inc., 47 units, Service Road/University Drive (18 sheets)
Sheet 1: automatic sprinkler/garage-- 1-24-78
Sheet 2:--Anda Construction Co., Duluth, Minn., Tropicana Apartments, 47 units, 4-29-77, exterior wall, base plates, foundation plan; 16 additional sheets
Sheet 3: 1st floor plan, 5-9-77
Sheet 4: 2nd and 3rd floor plan, 5-9-77
Sheet 5: west elevation, 5-5-77
Sheet 6: kitchen elevation, unit c and d-handicapped, 5-9-77
Sheet 7: unit a and b, east and west stair layout, 5-9-77
Sheet 8: typical exterior wall, typical stair, and interior balcony detail, 5-9-77
Sheet 9: beam splice and columns, 5-9-77
Sheet 10: roof plan, details
Sheet 11: E1, ground floor electrical plan
Sheet 12: E2, 2nd and 3rd floor electrical plan
Sheet 14: M1, Ground Floor plumbing plan
Sheet 15: M-2, 2nd and 3rd floor plumbing plan
Sheet 16: M-3, plumbing risers and details
Sheet 17: M-4, H & V partial plan and details
Sheet 18: M-5, roof plan HVAC

File 14

1. Warehouse at 1111 Front Street (Holland Furnace Company), with two pages of attached specifications for warehouse for E.J. Lamb of Fargo; six additional sheets
Sheet 1: stamped on bottom of drawing: Cash-Way, Inc., Lumber, Farm supplies, 2300 Front Street, Fargo, written on top of drawing: Lamb Warehouse, 1111 Front Street, 5-15-39, front elevation
Sheet 2: carbon copy of sheet 1
Sheet 3: side elevation
Sheet 4: carbon copy of sheet 3
Sheet 5: main floor plan
Sheet 6: basement plan

2. KFGO Radio Station, Broadcasting Studios; Northern States Broadcasting Co., 421 NP Ave., Fargo, W.R. Haggart, pres. and C.G. Burke, manager; William F. Kurke & Associates, Architects and engineers (2 sheets)
Sheet 1: second floor plan
Sheet 2: window details, partition details, room schedule, door schedule, and radio circuit conduit diagram; September 1947

3. Corwin Churchill Motor, 422 NP Ave., Block 12 (3 sheets)
Sheet 1: remodeling west building unit, 1st floor plan
Sheet 2: install one new elevator and remodeling pres. elev., Brady portion, 9-29-47
Sheet 3: remodeling west building unit, 1st floor plan, 9-25-47

File 15

1. Mr. George Hoenck Store: vaults in the basement; W. D. Gillespie, architect; one sheet; R. B. Mauschke, contractor; longitudinal section and cross section

2. S. Simonson & Co.: new store front; Braseth & Houkom, architects; plan no. 102 (2 sheets)
Sheets 1 and 2: outside and inside elevation

3. Fargo City Warehouse Addition, with three pages of specifications stapled to it; two additional sheets, Sheet 1: present warehouse and sheet two north and east elevation; September 9, 1927

4. Chesley Estate Alterations, 224 Roberts Street; Paul W. Jones, A.I.A., arch. (4 sheets)
Sheet 1: door schedule, electric schedule, and first floor plan
Sheet 2: door schedule, electrical diagram, and second floor plan
Sheet 3: basement floor plan
Sheet 4: details; April 1, 1938

5. F.W. Woolworth Company, Store 128; E. J. Muehlig, Superintendent of Construction (2 sheets)
Sheet 1: first floor plan, revised Dec. 26, 1930
Sheet 2: basement plan, revised Jan. 7, 1931

Alphabetical listing of the various buildings for which there are architectural drawings

20 Unit Apartment Complex
Advance Structures, Inc.
Anda Construction Company, Inc.
Banker's Construction 8-plex
BG Homes
Bowers Bros. Store
Butler Manufacturing Co.
Chesley Estate Alterations
Clark Super 100
Clark's Service Station for Petco Corporation
Co-operative Garage Company Building
Continental Block Remodeling
Corwin Churchill Motor
Crane Company Warehouse
Crane Johnson Laboratories
Fargo City Warehouse Addition
Fargo Foundary Addition
Federal Land Bank Office Building
Front Street (Warehouse at 1111)
Grand Theatre
Hogan Flats
Hoenck, Mr. George (store)
Interior Lumber
KFGO Radio Station
Kinney, Inc., Alterations of Store Front
Johnson, J.A. (shop)
Laudon, S.A., Garage (Sowden Garage crossed out)
Lessor, Sam and Hugo Fields, Garage Building
Milcor Lok-Rib Building
Moving Pictures Theatre
Nash Finch Co of Fargo
NW Telephone Exchange Company
Prairiewood Drive Apartments
Regan-Wieland 10-plex 
Riley, T.P., Apartments
S&L Tire
Simonson, S. & Company
Staiger 8-Plex on 30th Ave S
Standard Oil Company
State Theatre
Stern, Alex, Store and Lodgings
Texas Company (Texaco)
Welle, Ed, Construction
Wheel Service Company
Woolworth, F.W. Company
 
 

Fargo Inspections Department  |  City of FargoArchitecture and Historic Preservation

Search NDSU WebpagesBack to NDSU Homepage

For further information contact:
archives@www.lib.ndsu.nodak.edu
Telephone: 701-231-8914
Fax: 701-231-5632
Posted: 12/28/98